Hello, Guys its been a long spring & summer I'm ready for fall & winter. Hopefully, everyone is starting to get those plowing request in. I've added another truck to the arsenal plow and spreader go on next month went with a 17 CCSB 6.7 F350 gonna fit it with a 9.2 DXT with wings.

Anyway, what would you bid this property at for your area? 33k SQFT 1in trigger no salt no sidewalks per push pricing. Here is where I come in at. What're your thoughts. Thanks

1-2.99= 185
3-4.99= 249
5-6.99= 336.41
7-9.99= 454.15
10+ = 300HRLY
Land lot Urban design Grass Plant Asphalt
 

· Registered
Joined
·
375 Posts
Discussion Starter · #11 ·
$300/hr for a pick up. They won't go for it. Remember just because your new doesn't mean the customer is. Loaders are $150-250

The rest seems good.
At 10+ I would have 2 trucks on-site 150hr per truck. I havent had a problem yet because of the HRLY rate. I used it for all bids last year. I do see how it might be confusing I think I will just remove the HRLY rate and step the price up again. We don't get storms above 10in very often.
 

· Registered
Joined
·
837 Posts
Gotcha. This season I changed over to hourly over 6” if I could only needing to provide 1-3 and 3-6 pricing, although some are 10” or more hourly per their requirements.

This seems easier as we work and move differently during bigger or longer storms.
 

· Super Moderator
Joined
·
42,963 Posts
Hello, Guys its been a long spring & summer I'm ready for fall & winter. Hopefully, everyone is starting to get those plowing request in. I've added another truck to the arsenal plow and spreader go on next month went with a 17 CCSB 6.7 F350 gonna fit it with a 9.2 DXT with wings.

Anyway, what would you bid this property at for your area? 33k SQFT 1in trigger no salt no sidewalks per push pricing. Here is where I come in at. What're your thoughts. Thanks

1-2.99= 185
3-4.99= 249
5-6.99= 336.41
7-9.99= 454.15
10+ = 300HRLY View attachment 195596
Had a church which was 1acre that was rectangular and no curbs / light pole with 100' of walk and I spread aboot 20-30# of ice melt deoending on conditions.
1-4" I got $185 and every 4" increment was 60% more than the base rate.
Up to 4" would take aboot 20min to plow with a 8.2V with wings.
 