1. Welcome to PlowSite. Notice a fresh look and new features? It’s now easier to share photos and videos, find popular topics fast, and enjoy expanded user profiles. If you have any questions, click HELP at the top or bottom of any page, or send an email to help@plowsite.com. We welcome your feedback.

    Dismiss Notice

291,000 sq ft lot time estimate

Discussion in 'Bidding & Estimating' started by jdilliplane1, Oct 13, 2011.

  1. jdilliplane1

    jdilliplane1 Senior Member
    Messages: 110

    I am looking at bidding on a lot 291,000 sq ft, so roughly 7 acres. I am running my truck with a western wideout and figured another 8 ft blade. One guy will be using quad for sidewalks, etc. I am not looking for price, I know my hourly rates etc. I am figuring an acre per hour per truck so on a 1-4 hour storm figured 4 hours. I am getting stuck at the next increments. They want 4-6, 6-7, 8-10, 10-11, and over 11 is per inch. I was thinking a 150% for every increment based off my original estimate. My main worry is getting caught with my pants down if we get dumped on and can't keep up in which I would've needed another truck. Again, thanks for the help fellas:salute:
  2. Longae29

    Longae29 PlowSite.com Addict
    Messages: 1,954

    Picture would be helpful. Acre an hour isn't necessarily valid on large lots
  3. jdilliplane1

    jdilliplane1 Senior Member
    Messages: 110


    the address is 2054 Red Lion Rd. Phila, PA 19115, can't figure out how to save a map and post it.
  4. Wayne Volz

    Wayne Volz Senior Member
    Messages: 694

    Time to plow

    I figure about 5.9 hours total or 2.95 hours with both trucks on the site with a 2-3 inch snow. I calculated that with our plowing estimator with a 35% efficiency factor. Could be different based on the actual site layout and obstacles that may change production possibilities.

    No idea on sidewalks without seeing them and having the square footage. Good luck.
  5. jdilliplane1

    jdilliplane1 Senior Member
    Messages: 110

    yea, I'm good on the sidewalks. Buddy has a quad with plow on the front. Also, have a two stage, two single stages, etc. for that work. Figured two guys and should be done by the time the trucks are. Is my 150% increase in time for each estimate realistic?
  6. grandview

    grandview PlowSite Fanatic
    Messages: 14,609

    This one?............

  7. jdilliplane1

    jdilliplane1 Senior Member
    Messages: 110

    yes thank you
  8. cet

    cet PlowSite Fanatic
    Messages: 7,196

    That's a nice wide open lot. That isn't necessarily good for pickups. On a large snowfall you are going to have a hard time pushing with pickups.
  9. jdilliplane1

    jdilliplane1 Senior Member
    Messages: 110


    Ok guys, this is what I came up with.

    1-4 1080 3 hrs
    4-6 1620 4.5 hrs
    6-7 2160 6 hrs
    8-10 2700 7.5 hrs
    10-11 3240 9 hrs
    over 11 $350 per inch

    Salting is on a per occurence 6.7 acres x 900lbs= 6030lbs of salt and $900 per event

    These numbers were based off $150/hr for truck and $60/hr for shoveling for 2 guys
    salt was $300 per ton applied

    Any comments?
  10. jdilliplane1

    jdilliplane1 Senior Member
    Messages: 110

    Wanna get a few laughs.. First off, this was an offer from BFS or Brickman. they wanted
    1-4"=377.43 SALT was 307.23 for full application